Especially CG for this chair design.
here
General link to the Core 77 site for all to check out.
Green earth site
Happy designing... (:o)dz..i..ng
Saturday, 28 June 2008
Thursday, 26 June 2008
Thursday 26th June 08
Today we established project titles for all to progress.
DN to examine a portable? / movable adjustable projector stand to include storage.
CG to look at seating to include a space for storage - specifically a cat !! A catnap chair.
PA an unusual table which could be modular / asymmetric with storage.
Hy to look into a themed lighting display /lampshades.
NP to consider a stackable chair.
MM to investigate corner unit which is freestanding including storage.
ALL PROJECTS NEED TO BE RESEARCHED AND SPECIFIED BEFORE THE END OF TERM.
IN OTHER WORDS COMPLETE SECTION ONE OF THE MARK SCHEME.
This will allow everyone to put in the required time for their Product Studies. These sound very interesting and we look forward to reading them. Remember that they MUST be your OWN words. Mrs.Colley will lead you through this unit.
DN to examine a portable? / movable adjustable projector stand to include storage.
CG to look at seating to include a space for storage - specifically a cat !! A catnap chair.
PA an unusual table which could be modular / asymmetric with storage.
Hy to look into a themed lighting display /lampshades.
NP to consider a stackable chair.
MM to investigate corner unit which is freestanding including storage.
ALL PROJECTS NEED TO BE RESEARCHED AND SPECIFIED BEFORE THE END OF TERM.
IN OTHER WORDS COMPLETE SECTION ONE OF THE MARK SCHEME.
This will allow everyone to put in the required time for their Product Studies. These sound very interesting and we look forward to reading them. Remember that they MUST be your OWN words. Mrs.Colley will lead you through this unit.
Thursday, 12 June 2008
AS outline for the group starting in Sept 08
Please refer to your own BLOG which is here
Basically the outline is as follows.
UNIT 1 jointly taught at both sites until November.
UNIT 2 - one project from both schools ( portfolio approach ) finish in March 09
More detailed schedule / timeplan to come - this will be put up on my site.
If any students or parents need advice do not hesitate to contact me.
Mr. Geekie
Basically the outline is as follows.
UNIT 1 jointly taught at both sites until November.
UNIT 2 - one project from both schools ( portfolio approach ) finish in March 09
More detailed schedule / timeplan to come - this will be put up on my site.
If any students or parents need advice do not hesitate to contact me.
Mr. Geekie
Changes to the group for A2
Best wishes to Eddie for the future - he has decided to drop our subject for A2.
Not officially heard from TM or CB.
Everyone else is moving on to A2.
At an earlier meeting with BHS we decided the following
BHS to deliver the product study UNIT 4
BGS to deliver the practical element UNIT 5 with folio support from BHS
Joint delivery of UNIT 6 - the final 3 hour examination.
Not officially heard from TM or CB.
Everyone else is moving on to A2.
At an earlier meeting with BHS we decided the following
BHS to deliver the product study UNIT 4
BGS to deliver the practical element UNIT 5 with folio support from BHS
Joint delivery of UNIT 6 - the final 3 hour examination.
Subscribe to:
Posts (Atom)
